Kitchen Cabinets Bathroom Cabinets and Furniture Blog

Drill Up And Running

December 6th, 2008

Just thought you would like an update on the drill. It was down for 1 and a half shifts. Joe had parts shipped overnight and had the machine up an running as quick as possible. The parts that were sent had a different design in the spline making it a much more stable connection. Drill looks better in this photo than in the photo of it broken down.

Remember to enter our Christmas Drawing.


DSC02738.JPG

Your Ad Here

Leave a Reply

Spam Protection by WP-SpamFree

Proudly powered by WordPress. Theme developed with WordPress Theme Generator.
Creative Commons Attribution-NoDerivs 3.0 Unported
Creative Commons Attribution-NoDerivs 3.0 Unported